Interior design practices
We review elevations, door rhythm and clearances. If a drawn detail cannot be built as shown, we flag it for the designer to decide.
We manufacture kitchen cabinetry from drawings supplied by design and building teams in Barcelona. To assess a brief we need to know which drawing revision is current, what details remain open and who will sign off site dimensions before production.
We can join when a proposal can be broken down into units and responsibilities. Unresolved choices are recorded before a figure is calculated.
We review elevations, door rhythm and clearances. If a drawn detail cannot be built as shown, we flag it for the designer to decide.
Cabinet dimensions are checked against finished surfaces, services and site readiness. It helps to know which trade prepares each connection.
We group kitchens by type and record variations between plots. One design does not mean every property has identical measurements.
If you are still planning a kitchen for your own home, see our design and fitting service for homeowners
A presentation image explains appearance, but cutting lists need dimensions, references and fitting criteria. Send what exists and state its approval status.
Plans and elevations should show width, depth, height and interruptions along the run. Add a revision number or date to each file.
List base, wall and tall units plus special parts. If only a general design exists, agree who will prepare manufacturing details.
Describe substrates, edges and visible surfaces with samples or product references. Any alternative needs approval before ordering.
Ovens, refrigeration, dishwashers and extractors affect openings, airflow and access. Include exact models where selected.
Separate measurements taken on site from those assumed in drawings. State who will verify finished walls and approve adjustments.
Address, floor, lift and route through the building affect module size. State the number of kitchens and when each plot will be ready.
The offer should be checked against plans, materials and included work. Any change to these is recorded before production.
We list cabinets, doors, drawers, scribes and fittings included. Items still undefined are marked rather than hidden within one total.
Unloading, protection and fitting are specified where included. Worktops, equipment and connections appear as separate items or another trade’s responsibility.
We identify the version released for production. Later changes may affect material, cost or timing and are agreed before work proceeds.
These steps connect the first estimate to the final fitting. Measurements and specification come before the binding price.
Share the address, room photos, approximate measurements and the furniture you have in mind. We outline a price range to be checked against the measured space.
At the property we record the relevant dimensions, services and wall conditions. We also check how the pieces can enter the building.
If drawings or a design are needed, we develop them after the survey. The design work is included at no extra charge when you order us to manufacture to that project.
With the layout and specification agreed, we set out materials, fittings, delivery, installation and the final amount in writing.
You confirm the proposal and pay the deposit stated in the quotation. This authorises the production order.
We cut, finish and prepare the components according to the approved drawings and dimensions.
The team delivers and assembles the furniture, then adjusts fronts, hinges and visible joints.
Before closing the job, we go through doors, drawers and finishes together and record anything that needs a final adjustment.
Photo collection Furniture inspiration from MMV Estudio
View on Instagram
Photo collection Furniture inspiration from MMV Estudio
View on Instagram
Photo collection Furniture inspiration from MMV Estudio
View on Instagram
Photo collection Furniture inspiration from MMV Estudio
View on Instagram
Photo collection Furniture inspiration from MMV Estudio
View on Instagram
Photo collection Furniture inspiration from MMV Estudio
View on Instagram
That distinction lets us say whether the scheme can be priced now or whether a drawing, dimension or product reference needs resolving first.
Yes. We review dimensions, openings and specification with the author or responsible team before accepting a defined manufacturing scope.
Not for an initial review. Responsibility for detailing is agreed and production waits for validated drawings.
This is agreed explicitly. Dimensions can change after an unfinished room is tiled, so affected junctions are measured again.
Yes, with differences in function, finish and cost identified. No substitution goes into production without approval.
Only where listed. Every supply and connection needs an identified responsible party in the proposal.
A target helps planning, but the schedule is confirmed after scope, materials and approval are settled.
Dimensioned PDFs and appliance sheets. If you work in CAD, export relevant sheets at a readable scale; the form accepts images and PDFs.
State your role, site location, number of units and which design decisions are approved. Outstanding points can be listed in the message.
If you already have a kitchen design, we first check whether dimensions, hardware and appliances are specified for production. A rendering alone does not resolve every site junction.
We work from drawings, a finish schedule and a clear list of who supplies worktops and equipment. Changes are agreed before production starts.
Component sizes reflect building access and fitting sequence. Where other trades are involved, agreeing dependencies prevents units arriving before installation is possible.
Send drawings, available measurements, timetable and supply scope. We will identify any missing information needed for a manufacturing and fitting proposal.