How the project moves forward

Bespoke furniture fitting and installation in Barcelona

We can assist you inEspañolEnglishDeutschРусский

Fitting starts before the van arrives. Access, floor protection, component order and fixing points are considered when the furniture is designed.

Project process

Fit the final centimetres without improvising

A cabinet is finished when doors and drawers work in the actual room and the visible junctions have been checked with the client.

01

Route into the building

Entrance, lift and staircase sizes are confirmed before maximum module dimensions are set.

02

Protecting the room

The route for components and existing surfaces that need care are agreed in advance.

03

Suitable fixing

Wall construction and cabinet load guide the anchor choice; not every substrate is the same.

04

Levels and joints

Floors and walls can vary. Scribed details allow fronts to align and junctions to close.

05

Hardware adjustment

Doors, drawers and mechanisms are regulated after the unit is assembled.

06

Joint review

Opening, finish and the state of the work area are checked with the client.

Project thinking

From building entrance to final door adjustment

Installation is part of the agreed scope and is planned against the real conditions of the property.

01

Access information early

For an upper-floor flat, floor level, lift, door widths and unloading conditions matter. A difficult route can require the cabinet to be delivered in suitable sections.

02

Other work in the room

Where painting, electrical work or a worktop installation continues, the sequence is agreed. A finished front should not be fixed where a socket or lining still has to change.

03

Fixing and safety

A wall-hung sideboard or tall bookcase needs a known substrate. The site check informs fixing choice and helps locate services that must not be drilled.

04

Adjustment in the final position

A door that moved well in the workshop may need regulation once the unit sits on the actual floor. Fronts are levelled, drawers tested and gaps checked.

05

Handover together

Visible joints, operation and finishing are reviewed with the client. We explain any material-specific care and how to report an issue found during the check.

What to send with your enquiry

  • Photographs of the whole space and any awkward details
  • Approximate width, height and depth
  • What needs to change and what you are keeping
  • The address, access details and preferred timing
Before choosing

Questions about bespoke furniture fitting and installation

Should the room be cleared?+

Working space and the delivery route should be agreed before fitting day.

Are doors and drawers adjusted on site?+

Yes, final regulation happens with the cabinet fitted and level.

What is checked at handover?+

Operation, visible junctions and the work area against the agreed scope.

Start with the details you have

Explain access to the property

Alongside room photographs and rough sizes, include the floor level, lift and any work still in progress. These details help assess fitting from the first proposal.

  1. 01 We review the scope of your idea
  2. 02 We identify dimensions still needed
  3. 03 Materials and fitting are specified before you order
Send by WhatsApp

The access and finishing plan is confirmed before installation.