Route into the building
Entrance, lift and staircase sizes are confirmed before maximum module dimensions are set.
Fitting starts before the van arrives. Access, floor protection, component order and fixing points are considered when the furniture is designed.
A cabinet is finished when doors and drawers work in the actual room and the visible junctions have been checked with the client.
Entrance, lift and staircase sizes are confirmed before maximum module dimensions are set.
The route for components and existing surfaces that need care are agreed in advance.
Wall construction and cabinet load guide the anchor choice; not every substrate is the same.
Floors and walls can vary. Scribed details allow fronts to align and junctions to close.
Doors, drawers and mechanisms are regulated after the unit is assembled.
Opening, finish and the state of the work area are checked with the client.
Installation is part of the agreed scope and is planned against the real conditions of the property.
For an upper-floor flat, floor level, lift, door widths and unloading conditions matter. A difficult route can require the cabinet to be delivered in suitable sections.
Where painting, electrical work or a worktop installation continues, the sequence is agreed. A finished front should not be fixed where a socket or lining still has to change.
A wall-hung sideboard or tall bookcase needs a known substrate. The site check informs fixing choice and helps locate services that must not be drilled.
A door that moved well in the workshop may need regulation once the unit sits on the actual floor. Fronts are levelled, drawers tested and gaps checked.
Visible joints, operation and finishing are reviewed with the client. We explain any material-specific care and how to report an issue found during the check.
Photo collection Furniture inspiration from MMV Estudio
View on Instagram
Photo collection Furniture inspiration from MMV Estudio
View on Instagram
Photo collection Furniture inspiration from MMV Estudio
View on Instagram
Photo collection Furniture inspiration from MMV Estudio
View on Instagram
Photo collection Furniture inspiration from MMV Estudio
View on Instagram
Photo collection Furniture inspiration from MMV Estudio
View on InstagramWorking space and the delivery route should be agreed before fitting day.
Yes, final regulation happens with the cabinet fitted and level.
Operation, visible junctions and the work area against the agreed scope.
Alongside room photographs and rough sizes, include the floor level, lift and any work still in progress. These details help assess fitting from the first proposal.