MMV Studio

Hinged-door wardrobes in Barcelona

We can assist you inEspañolEnglishDeutschРусский

Designed for the space, specified for use and fitted on site

Hinged fronts can reveal more of the wardrobe at once. Before choosing them, measure the space in front: an open door must work beside the bed, bedside table and walkway.

Survey and fitting in BarcelonaHomes and professional spaces
Designed for your space

Full access needs room to swing

Visible finish is chosen alongside the leaf weight that hinges must carry. In uneven recesses, gaps and scribes are calculated for smooth door movement.

01

A wider view inside

Opening more of the front makes finding belongings easier, provided the door reaches its planned angle.

02

No collisions

Bed, bedside table, light switches and nearby doors are checked in each position.

03

Panel weight

Height, material and width determine hinge count and adjustment.

04

Overhead storage

A separate top door can make everyday clothing easier to reach.

Our process

How we work, step by step

These steps connect the first estimate to the final fitting. Measurements and specification come before the binding price.

  1. Initial estimate

    Share the address, room photos, approximate measurements and the furniture you have in mind. We outline a price range to be checked against the measured space.

  2. Measured survey

    At the property we record the relevant dimensions, services and wall conditions. We also check how the pieces can enter the building.

  3. Design, when required

    If drawings or a design are needed, we develop them after the survey. The design work is included at no extra charge when you order us to manufacture to that project.

  4. Detailed quotation

    With the layout and specification agreed, we set out materials, fittings, delivery, installation and the final amount in writing.

  5. Approval and deposit

    You confirm the proposal and pay the deposit stated in the quotation. This authorises the production order.

  6. Workshop production

    We cut, finish and prepare the components according to the approved drawings and dimensions.

  7. Fitting on site

    The team delivers and assembles the furniture, then adjusts fronts, hinges and visible joints.

  8. Review with you

    Before closing the job, we go through doors, drawers and finishes together and record anything that needs a final adjustment.

Profile image for Joaquín Pardo
Joaquín PardoYour contact in Barcelona
Your project starts here

Give every centimetre a purpose.

I'm Joaquín Pardo. Show me the awkward corner, column or wall that is limiting your room. We can start with what you need to store and explore ways to use the space without crowding it.

No obligation. Rough measurements are enough to get started.

Six configurations

Six choices within one hinged front

Two wardrobes of equal width may need different door sizes because of use and obstacles in the room.

ConfigurationUsually solvesCritical check
Tall door Creates a continuous line Check rigidity, weight and access to the top.
Separate overhead door Keeps seasonal storage apart Place the horizontal line without interrupting drawers or shelves.
Narrow leaf Shortens the swing arc Adds more joints and hinges to align over time.
Wide leaf Opens a larger section at once Allow space beside bed and circulation.
External pull Provides a direct grip Check projection against wall or adjacent furniture.
Finger-pull or push Keeps the front visually quiet Try the action on heavy doors and consider fingerprints.
Written scope

Decisions that shape this project

Wider interior access only helps when each leaf has enough room to swing.

01

Interior visible at once

Open leaves can expose more rails and drawers than sliding doors across the same width.

02

Swing beside the bed

Clearance ahead is calculated so doors and drawers avoid nearby furniture.

03

Width of each leaf

Division avoids overly heavy fronts and puts hinges where the body can carry them.

04

Meeting ceiling and wall

Swing is also assessed beside mouldings, radiators and adjacent handles.

05

Hinge suited to leaf

Weight, height and frequency of use determine hinge number and specification.

06

Front and edge

Construction affects stability and alignment between doors.

If keeping an existing cabinet body, its condition and fixings are checked before replacing fronts alone.

Questions before the survey

Questions about the doors

How much space is needed in front?+

It depends on leaf width and nearby furniture. The swing is measured before divisions are fixed.

Can fronts be handle-free?+

Yes, where the mechanism is comfortable for the size and weight. Try the action first.

Can just the doors be replaced?+

Possibly, if the existing cabinet body and fixings are sound.

Start with the details you have

Send a photo that includes the bed

Its position and nearby furniture help establish the door swing. Add the wardrobe width and tell us how each zone will be used.

  1. 01 We review the scope of your idea
  2. 02 We identify dimensions still needed
  3. 03 Materials and fitting are specified before you order
Send by WhatsApp

Final divisions follow measurement of the opening and walkway.

Guided enquiry

Tell us what you have in mind

You do not need finished drawings. Your photos and rough measurements are enough to start a conversation.

Step 1 of 6 · Project

What piece of furniture do you need?

Select the type of commission; there is room to explain the space later.

Project type
Step 1 of 6

Hinged wardrobe doors: check the full swing

Hinged doors show much of the wardrobe interior at once. They work where the leaves can open without moving the bed or blocking passage.

We draw each swing beside bedside tables, radiators and switches. Narrower leaves may be more practical than a front made of large doors.

Hinge positions and front weight are matched to the material. For a tall front we settle divisions and adjustment details before manufacturing.

Send width, height, available depth and a photograph taken from the opposite wall. After measuring, we design the doors and interior together.