MMV Studio

Bespoke hotel furniture in Barcelona

We can assist you inEspañolEnglishDeutschРусский

Furniture planned around staff, customers and daily work

Bespoke hotel furniture in Barcelona. Wardrobes, headboards, desks and reception furniture are specified by use. Cleaning, maintenance and repetition across rooms help define details and replacement parts.

Survey and fitting in BarcelonaHomes and professional spaces
Designed for your space

Repeatable rooms, furniture built for constant use

Hotel furniture is opened, cleaned and inspected repeatedly. We review a sample room, access and maintenance before carrying the design across multiple rooms.

01

Designed for the space

Dimensions and layout are checked against the room and your priorities.

02

Choices explained

We compare suitable materials and hardware before the specification is approved.

03

Scope in writing

The quotation identifies the furniture, fitting and any optional or separate work.

04

One project contact

Your contact coordinates questions about the proposal and the next steps.

Our process

How we work, step by step

These steps connect the first estimate to the final fitting. Measurements and specification come before the binding price.

  1. Initial estimate

    Share the address, room photos, approximate measurements and the furniture you have in mind. We outline a price range to be checked against the measured space.

  2. Measured survey

    At the property we record the relevant dimensions, services and wall conditions. We also check how the pieces can enter the building.

  3. Design, when required

    If drawings or a design are needed, we develop them after the survey. The design work is included at no extra charge when you order us to manufacture to that project.

  4. Detailed quotation

    With the layout and specification agreed, we set out materials, fittings, delivery, installation and the final amount in writing.

  5. Approval and deposit

    You confirm the proposal and pay the deposit stated in the quotation. This authorises the production order.

  6. Workshop production

    We cut, finish and prepare the components according to the approved drawings and dimensions.

  7. Fitting on site

    The team delivers and assembles the furniture, then adjusts fronts, hinges and visible joints.

  8. Review with you

    Before closing the job, we go through doors, drawers and finishes together and record anything that needs a final adjustment.

Profile image for Joaquín Pardo
Joaquín PardoYour contact in Barcelona
Your project starts here

Give every centimetre a purpose.

I'm Joaquín Pardo. Show me the awkward corner, column or wall that is limiting your room. We can start with what you need to store and explore ways to use the space without crowding it.

No obligation. Rough measurements are enough to get started.

Solutions for your space

From the first drawing to a room staff can maintain

Hotel staff know the recurring problems. Their input helps us place service panels, replaceable parts and practical surfaces.

01

Headboard with organised services

Bedside units, reading lights and outlets are planned so a repair does not mean dismantling the whole wall.

02

Room for luggage

The wardrobe must accommodate cases, a safe, clothes and a short housekeeping turnaround.

03

A working reception desk

The visible counter is developed with terminals, filing, staff movement and guest service in mind.

04

Shared areas with several roles

A lobby may be used for waiting, conversation or work; its seating and tables should support each.

Specific information

Specify hotel joinery by how it is used

One visual language can run through the property without forcing the same cabinet into every type of space.

01

Standard guest room

Before making a series, we check dimensions and junctions in a representative room.

02

Suite or special room

The joinery follows the actual plan and extra equipment instead of copying the standard layout.

03

Reception and lobby

Guest routes, staff access, luggage and supplies all affect the arrangement.

04

Housekeeping support

Shelves and cupboards are sized for the actual trolleys, linen and consumables.

Three ways to approach the specification

What to prioritise in guest rooms

Hotel category alone does not decide cleaning, repair access or the guest experience.

Foundation01

Use and maintenance

Address knocks, cleaning, supports and service access.

  • Edges protected
  • Fixings can be checked
  • Dimensions verified by type
Identity03

A recognisable interior

Finishes and panelling give character with components the team can maintain.

  • Samples approved
  • Parts documented
  • Spares planned where relevant
A detailed quotation

The information behind a useful quotation

You can start with rough dimensions. We will tell you what needs to be checked before a final specification is prepared.

Example of bespoke hotel furniture in Barcelona
01

The space

Photographs and approximate dimensions show the available area and nearby doors or services.

02

Your priorities

Explain what you need the furniture to do and what is missing now.

03

Your references

Send a few examples and point out the details you like.

04

Timing and access

Tell us the address, intended date and any work taking place before fitting.

From early guidance to a final figure

From enquiry to a confirmed proposal

01First review

We assess the information, clarify the scope and identify missing details. This enquiry does not generate an automatic price.

02Detailed quotation

The proposal sets out the agreed design, specification, price and fitting conditions after the necessary checks.

Send what you already have. We can identify the next useful photograph, measurement or decision.

Send photographs and dimensions → Send via WhatsApp
Illustrative material detail for bespoke hotel furniture
Materials and details

Choose the specification as a whole

A surface, its supporting board, edges and hardware need to work together.

StructureSupports and thicknesses depend on dimensions and the intended load.
FinishColour and texture are considered alongside cleaning and exposure.
HardwareHinges, runners and mechanisms are selected for their intended use.
JunctionsEdges, fixings and access panels are resolved before manufacture.

Product-specific performance and care instructions are checked against the selected specification.

Before deciding

Questions about hotel furniture

Could you make a sample room first?+

It is a useful way to check dimensions, services and finishes before repeating a design. Its scope is set out in the proposal.

Can you fit furniture while the hotel is open?+

We review the work floor by floor or area by area with management. Dates depend on access, protection and room availability.

How do you handle rooms with different dimensions?+

We group room types but record the measurements and exceptions that affect manufacture or fitting.

Start with the details you have

Send the room types and intended schedule

Share plans, room counts by type, photographs and the construction phase. If the hotel is open, tell us which areas can be made available.

  1. 01 We review the scope of your idea
  2. 02 We identify dimensions still needed
  3. 03 Materials and fitting are specified before you order
Send by WhatsApp

The proposal distinguishes the pilot, repeat production and fitting conditions.

Guided enquiry

Tell us what you have in mind

You do not need finished drawings. Your photos and rough measurements are enough to start a conversation.

Step 1 of 6 · Project

What piece of furniture do you need?

Select the type of commission; there is room to explain the space later.

Project type
Step 1 of 6

Hotels: consistent rooms with site-specific fitting

In a hotel, one family of furniture may need to fit rooms of different sizes. We verify room types before finalising repeated units and their adjustments.

Luggage, cleaning and maintenance influence edges, supports and access. A headboard or wardrobe must stand up to intended use while keeping necessary services reachable.

Delivery may be planned by floor or phase around occupancy and site access. The schedule needs agreement with hotel operations.

Send room-type drawings, room count, finish references and available dates. Those let us define samples and manufacturing scope.